Discipline: DBFOM
Sector: Infrastructure (Motorways)
Client: Gdansk Transport Company S.A
(ultimate client: Ministry of Infrastructure)
Start: 14 October 2011
Duration: 27 years
Status: ongoing
Routine O&M activities:
Tolling:
Continuation of the A1 Phase 1 project to Torun and it is part of European Road E 75 which provides access to Southern Europe. The A1 motorway will cross the A2 and A4 motorways in Poland. It is therefore part of Poland’s international route connection. Financial close was achieved in July 2009. Construction is expected to be complete by December 2011.
Project consists of 62 km of tolled A2 Motorway south between Nowe Marzy and Torun. There are 51 bridge structures including 2 river bridges of 500 m and 1000 m.
Intertoll Polska Sp. z o.o. (100% Intertoll Europe ZRt. affiliate) is in charge of the operation and maintenance of the motorway as well as the manual toll collection (a closed system, consists of 1 mainline toll plaza and 5 ramp toll plazas.
Total number of toll lanes: 39 (16 entry and 23 exit lanes).
Other roles of Intertoll in this project:
Head Office:
BudaWest building
Rétköz útca 5.
H-1118 Budapest, Hungary
Barham Court
Teston
Maidstone
Kent, ME18 5BZ, United Kingdom
Phone - +44 1622 232742
Fax - +44 1622 812089
Pelplin Office
Ropuchy 7a
83-130 Pelplin, Poland
Phone: +48 58 530 66 99
Fax: +48 58 530 66 95
E-mail:
Levent Mahallesi Cömert
Sokak No: 1,
Yapi Kredi Plaza C Block
No: 40-41, Floor: 17
Levent, 34330 Beşiktaş, Istanbul, Turkey
Intertoll Infrastructure Developments BV,
President Kennedylaan 19,
Den Haag 2517 JK,
Netherlands